2011 Ultimate Beach House, Week 13: Final Count Down

June 28, 2011 | By | Comments (1)

4 The Ultimate Coastal Living House is a week or so from being complete and then will be ready to be turned over to the Coastal Living Interior Decorators! So as we count down to the turn over, last minute installations and touches are getting done.

 On the exterior, light Fixtures have been completely installed, the irrigation system is nearly complete, all outside painting is done & the landscaping should be completed by the end of this week.

 For the interior, all cabinetry, flooring, doors and hardware are complete. Painting is near the end and all plumbing fixtures and sinks have been installed.

 We are just merely days away until the brilliant interior decorators coordinate the gorgeous final pieces of this house & yes we are pretty giddy about it!

 

 

 

3 2

1 



Blog by: Angela K. Smith

Photos by: Robbie Hickman

Find out more about our 2011 Ultimate Beach House!

COMMENTS

  1. Metal Wall Art

    If this is your first time using metal paints, try priming and painting a practice object before taking on your main project. The more you can perfect the craft, the better your final project will end up.

    February 4, 2012 at 8:49 am

Leave a Comment

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s